Skip to content

Factory

Inside the 8,000 m² Smart Factory

ISO 9001 + GMP certified production. French Schneider Electric controls. Pearl River Delta vertical supply chain.

Production walkthrough

Six stations, end to end, from raw stainless coil to crate-ready machine.

Sheet metal fabrication
Station 1

Sheet metal fabrication

CNC laser cutting and bending of SUS304 / SUS316 stainless steel. ISO 9001 quality control on every panel before weld station.

Welding and finishing
Station 2

Welding and finishing

TIG welding by certified welders. Argon-shielded for food-grade weld integrity. Pickling and passivation per ASTM A967.

Subassembly
Station 3

Subassembly

Pumps, motors, plumbing pre-assembled in clean conditions. Schneider Electric controls integrated at this stage.

PLC programming and testing
Station 4

PLC programming and testing

Each PLC loaded with customer-specific cycle profiles. Cold-start factory test before final assembly.

Final assembly
Station 5

Final assembly

Chamber, doors, controls integrated on the assembly line. Hour-by-hour quality inspection. Pre-shipment factory acceptance test.

Quality inspection
Station 6

Quality inspection

Full cycle test with thermocouple validation, electrical safety test, pressure leak test, certified before crate-out.

The numbers

  • 8,000 m² manufacturing floor space
  • 12,000 units / year annual production capacity
  • Under 3% defect rate at final QA
  • 92% vertically controlled component sourcing
  • 25% material waste reduction vs industry average
  • 30% faster production turnaround vs industry average

Vendor partners

  • Schneider Electric — PLC, contactors, motor protection
  • SUS304 / SUS316 stainless — TISCO mill-certified
  • EBM-Papst — exhaust fans (optional upgrade)
  • SEW EuroDrive — chamber rotation gear motors (optional upgrade)
  • WIKA — pressure and temperature instrumentation

Visit us

We welcome serious buyers to visit the factory in person. Standard factory visit includes a production walkthrough, PTW-1900 live demo cycle, engineering review with our application team, and lunch in Shenzhen.

Visa invitation letters provided. We can also arrange airport pickup from Shenzhen Bao'an, Hong Kong, or Guangzhou Baiyun.

Plan your factory visit

Ready to Modernize Your Plant's Cleaning?

Get a configuration-specific quote within 12 business hours. Custom rack dimensions, electric or steam heating, full installation specs included.