Skip to content

Product · Customization

Our chamber fits YOUR trolleys

Don't replace your trolley fleet. We engineer the wash chamber around your existing equipment.

Why standard chambers don't fit every operation

The "standard bakery rack trolley" varies surprisingly. Swedish industrial bakeries standardize on 800 mm wide trolleys. North American institutional kitchens use 18×26 inch (457×660 mm) sheet pan trolleys. European GN1/1 commissaries use 530×325 mm trays on 600 mm wide trolleys. Airline catering uses ATLAS / KSSU half-size or full-size trolleys (300 × 400 / 400 × 800 mm).

Buying a fixed-chamber rack washer means either (a) replacing your entire trolley fleet to fit the washer, or (b) loading the washer inefficiently because trolleys don't fit. V-TAI's approach: customize the chamber to fit your trolleys.

Customization range

DimensionStandardCustom range
Chamber width750 mm700–900 mm
Chamber depth1000 mm900–1200 mm
Chamber height1900 mm1700–2100 mm
Floor load rating250 kgUp to 400 kg (reinforced floor option)

Beyond these ranges, project-specific engineering review. We have built one-off chambers up to 1100 mm width × 1300 mm depth × 2200 mm height for airline-catering ULDs and oversize hospital meal carts.

Lead time impact

Standard chamber: 4–6 weeks FOB Shenzhen.
Custom chamber within standard range: 6–8 weeks FOB Shenzhen (+2 weeks vs standard).
Project-specific engineering review chamber: 10–14 weeks depending on dimension and material specification.

Custom chambers do not carry a price premium versus standard in most cases — only when dimensions exceed the standard tooling envelope does pricing change.

Engineering review process

  1. Submit your trolley specifications. CAD drawing preferred, or dimensioned hand-sketch with trolley wheel base, trolley height including handles, tray sizes loaded, and any non-standard features.
  2. V-TAI engineering returns CAD draft within 5 business days showing chamber dimensions, door opening, ramp/pit configuration, utility connections.
  3. You approve or request changes. Iterative — most projects converge in 2 review cycles.
  4. Production begins on approved CAD. Lead time clock starts.

What we need from you to start the review

Common customization scenarios

Send your trolley specs

Tell us about your operation. Our engineering team replies within 12 business hours.

Ready to Modernize Your Plant's Cleaning?

Get a configuration-specific quote within 12 business hours. Custom rack dimensions, electric or steam heating, full installation specs included.